- ページ 6
リフティングシステム Bend-Pak HD-12LSXのPDF 設置および操作マニュアルをオンラインで閲覧またはダウンロードできます。Bend-Pak HD-12LSX 20 ページ。 12,000 pound capacity four-post lift

STEP 3
( Column & Cross Tube Installation )
1. Locate the columns at their respective locations according to the chalk line layout. ( See above )
Pay attention to the power unit location. DO NOT BOLT columns down at this time. Use caution to
prevent columns from falling over. Raise the cross tubes ( making sure the plastic slide blocks are still in
position ) and drop down into the top of the columns. The large cut-out holes should be positioned inward
following the diagram on page 5. (See Fig. 1)
Fig. 1
6