- ページ 4

コントローラー Bender CC612 EVのPDF クイック・スタート・マニュアルをオンラインで閲覧またはダウンロードできます。Bender CC612 EV 12 ページ。

Connection
I
D
! Risk of electric shock!
anger
Parts of the system can be energised (the charge controller terminals up to 12 V, the charging
system voltage is 230 V). Before touching live parts of the system, ensure that the installation
has been de-energised.
i
The RJ45 user interface is not intended as an Ethernet interface.
i
The use of Nano SIM cards with a corresponding SIM card adapter may damage the SIM card
slot.
Therefore, it is recommended to use only Micro SIM cards.
i
Further information on the connection can be found in the manuals of the accessories (e.g.
W15BS).
• Connect PE to „0V"; reference level for Control Pilot (CP communication) must be at same level
as the power supply (IEC 61851 standard).
• Cable lengths (except Modbus, Power IN and charging cable) < 3 m; cables must be positioned
inside the wallbox/charging station and should not be laid parallel to power cables.
• Modbus (A, B) must be connected using a shielded cable; connect shield to PE.
L1
L2
L3
N
PE
4
CC612(4G)_D00325_05_Q_XXEN / 10.2019
a
H
b
c
d
e
CP PP
N
L1
PE
L3
L2
M
A
+
+
IN
f
PP
CP
L1
N
PE
L2
L3
Bottom view Frontal view Top view
B
i
12V
0V
11
14
12V 0V 11 14
AC
12 V
C
0 V
DC
3
6
D
2
5
1
4
C
PP
21
IN1–
IN2–
g
PP
j
21
m
IN1–
n
IN2–
A
CC612
RJ45
E
ALARM
RJ10
READY
F
PLC
IN + OUT –
A
B
CP
24
IN1+
IN2+
h
CP
24
IN1+
IN2+