- ページ 2

コントロールユニット BENDIX PP-1のPDF マニュアルをオンラインで閲覧またはダウンロードできます。BENDIX PP-1 4 ページ。 Push-pull type control valves

BENDIX PP-1 マニュアル
AUTOMATIC
MOMENTARY
EXHAUST
PP-1
20,30,40
or 60 psi
PP-2
40 psi
PP-5
40 psi
RD-3
Must be held
PP-8
REMOVAL
Block and/or hold the vehicle by a means other than air
brakes and drain all reservoirs.
1. Drive the button roll-pin out with a punch and remove the
button.
2. Mark each air supply line and its port for easy reinstalla-
tion, then disconnect them. Remove the valve from the
panel by removing the panel mounting nut.
INSTALLING
1. Install valve in panel, securing with the panel mounting
nut.
2. Reconnect the air lines using marks made during removal
as a guide.
3. Install the operating button. Secure the operating button
by installing the button roll pin.
DISASSEMBLY: PP-1
VALVES
1. Remove the two cap screws (3) which retain the lower
cover and remove cover. Remove the sealing ring (4).
2. Insert a small punch through the roll pin hole in the stem
and remove the lock nut (5).
3. Remove inlet-exhaust valve (6) and plunger (7) and spring
(8) (if any).
4. Remove o-ring (9) from plunger.
DISASSEMBLY: PP-5
1. Perform same operations as for PP-1
2. Remove inlet seal (10) in Figure 4 from lower cover.
Remove the ring diaphragm (4) from the inlet seat.
3. Remove piston (11) Figure 4 and o-ring (2).
DISASSEMBLY: PP-2
1. Insert a small punch through the roll pin hole in the plunger
and remove the lock nut (1) from the plunger.
2. Withdraw the plunger and remove the spring (9) and
o-ring (8).
3. Remove the two machine screws (2) and remove the
lower cover (3).
2
PILOT TRIP
APPLY
FEATURE
AUTOMATIC
18 psi
manually
Will remain in
either position
, PP-8
AND RD-3
VALVE
valve.
VALVE
4. Remove the inlet-exhaust valve (4), and piston (5).
NON-
5. Remove o-rings (6 & 7) from piston.
OPERATING AND LEAKAGE TESTS
PP-1
, PP-8
1. An accurate test gauge should be tee'd into the supply
line and a means of controlling the supply pressure pro-
vided. Apply a 120 psi air source to the supply port. A
small volume reservoir (e.g. 90 cu. in.) with a gauge
should be connected to the delivery port.
2. With 120 psi supply pressure, and the button pulled out
(exhaust position), leakage at the exhaust port should
not exceed a 1" bubble in 5 seconds; at the plunger
stem a 1" bubble in 5 seconds. There should be no leak-
age between upper and lower body.
3. Push the button in (applied position). Leakage at the ex-
haust port should not exceed a 1" bubble in 3 seconds; at
the plunger a 1" bubble in 3 seconds. (The RD-3
will have to be manually held in this position.)
4. Reduce the supply pressure. At a pressure from 60 to
20 psi depending on the spring installed the button should
pop out automatically, exhausting the delivery volume.
(This does not apply to the RD-3
PP-1
valve's).
PP-5
VALVE
1. Proceed as for PP-1
2. Connect a modulated source of air pressure to the pilot
air inlet. With the button pushed in (applied position)
with 125 psi supply pressure and a gradually increasing
pressure applied at the pilot air port the valve should
move to the release position with a pilot pressure of not
more than 18 psi. Leakage in this mode should not
exceed a 1" bubble in 3 seconds at the exhaust port
and a 1" bubble in 5 seconds at the plunger stem.
PP-2
VALVE
1. Proceed as for PP-1
2. With the button pulled out (exhaust position), leakage
at the brake valve port or at the plunger stem should not
exceed a 1" bubble in 5 seconds.
3. Push the button in. Supply pressure should be present
in the delivery volume. Leakage at the exhaust port or
around the plunger stem should not exceed a 1" bubble
in 5 seconds.
4. Pull the button out and apply supply pressure at the
brake valve port. Supply pressure should be present in
the delivery volume and leakage at the exhaust port
should not exceed a 1" bubble in 5 seconds.
Note: If any of the above push-pull valves do not function as
described or if leakage is excessive, it is recommended
they be returned to our nearest authorized distributor for a
factory rebuilt or new valve.
, RD-3
VALVE
valve through Step 3.
valve through Step 1.
valve
, PP-8
or some