自転車アクセサリー Dawn To Dusk TEKLITE TUBIE 285のPDF 使用方法をオンラインで閲覧またはダウンロードできます。Dawn To Dusk TEKLITE TUBIE 285 2 ページ。

PLEASE COMPLETELY UNDERSTAND ALL USER INSTRUCTIONS AND SAFETY INFORMATION BEFORE USING THIS PRODUCT. AS WITH ANY HIGH TECH PRODUCT
YOU WILL NEED TO ROUTINELY CHECK FOR LOOSE HARDWARE, CRACKS OR OTHER DAMAGE AND REPLACE ITEMS AS NECESSARY. DO NOT USE PRODUCT IF
ANY OF THESE CONDITIONS EXIST.
TEKLITE TUBIE 285
INSTALLATION INSTRUCTIONS:
STRAPS AND HARDWARE INCLUDED
a.
Frame straps, 189 x 19 mm (x2)
b.
M5 x 16 mm button flange bolts (x2)
A.
MOUNTING BAG USING STRAPS
With the Velcro facing towards the bag, feed the round end of a frame
strap through one of the slots on the bottom of the bag. Repeat with the
second frame strap. Figure A.
Position the bag on whatever main frame tube or seatpost that will be
safe, and where the bag will not interfere with any rotating or moving
part of the bike. Wrap the strap around the tube and thread the end
through the buckle. Pull the strap tight and push the hook end of the
Velcro into the soft loop surface of the strap ensuring a secure fasten.
Repeat with second strap. Figures B & C.
TEKLITE TUBIE 285 INSTRUCTIONS
Figure B
TOOLS REQUIRED
4 mm Hex Wrench
Torque Wrench
1.1 Nm
Top tube bag installation using straps
Figure A
Figure C
1