- ページ 7

ラック&スタンド Great Lakes GL48SRのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Great Lakes GL48SR 8 ページ。 19" eia wall mount swing rack
Great Lakes GL48SR にも: 取付説明書 (12 ページ)

Great Lakes GL48SR 取付説明書
UNIVERSAL
The 19" EIA Swing Frame Rack can be hinged (retractable pin) on either side.
Customer needs to determine which side is to open. To open, simply retract
both pins (top and bottom) and then open the Swing Frame Rack similar to that
of a door.
LEFT HAND
OR
RIGHT HAND
CAUTION:
When installing 19" EIA equipment, make sure both retractable pins (2) are
secured into the rear section that has been mounted to the wall. Be sure
all screws, nuts, and mounting hardware are tightened before loading with
equipment.
Secure retractable pins into receptacle (2 locations)
7