- ページ 7

コントローラー Celec S-50のPDF 現場設置マニュアルをオンラインで閲覧またはダウンロードできます。Celec S-50 10 ページ。

Field Installation Manual
Use these instructions
If 200 Amp circuit breaker is unavailable, existing blanks are available.
S-50 unit is designed for use with Customer Main Breaker Panel Three Phase
208V AC WYE/Delta Connection, up to 1600 Ampere.
S-50 units should be mounted with appropriate sized fasteners before connect to Main Breaker
Panel.
1.
Using panel key open the door of S-50 exposing connections.
2.
Remove existing 3 Pole breaker blanks and install new 3 Pole 200 Amp circuit Breakers.
3.
For rest of connection follow the Connection type#1 on page 5.
______________________________________________________________________________________
S-50
Connection Type#2
7