- ページ 9
ドローン HIGH VOLUME O2 HVO GO+GO NAKEDのPDF セットアップマニュアルをオンラインで閲覧またはダウンロードできます。HIGH VOLUME O2 HVO GO+GO NAKED 16 ページ。
Step 6: Prepare the Master
● The master is the head box and tank combo.
● Place the master in its permanent location.
● Ensure that the ball valve is in the open position.
NOT be under pressure.
● remove the hex nut cap and install a bushing in the opening. The
bushing will be used to connect the braided steel line that runs
between The master and Drone tanks.
Don't plug the system in until the
last step. No power is needed yet!
Remove hex nut "cap"
NOTE
the tank MUST
side view
9