- ページ 2
配管製品 Galvin Engineering CLEVAKIT1CPのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Galvin Engineering CLEVAKIT1CP 6 ページ。 Hand shower kit
Product Installation Guidelines
-
PRE
INSTALLATION
MOUNTING DETAILS
−
If the mounting holes do not already exist, mark out and drill the holes as shown in rough-
in dimensions.
For Tapware
Wall body
− Wall body must be G5/8" FI and body should be
between 0 and 15mm behind the finished
wall surface.
© Galvin Engineering Pty Ltd
th
Version 1, 25
Version 1, 1 June 2022, Page 2 of 6
0 to 15mm
G 5/8"
May 2022, Page 2 of 6