- ページ 4

トイレ MAINLINE MLS10008のPDF 取付説明書をオンラインで閲覧またはダウンロードできます。MAINLINE MLS10008 14 ページ。 Dual flush round and elogated toilets

ASSEMBLY INSTRUCTIONS
3. Install Wax Ring (CC*), (Figure 2)
• Turn toilet bowl (B) upside down onto a towel or
cushioned surface. With the rounded (tapered)
end of the ring facing the toilet, place the wax ring
(CC*) around the raised outlet ring of the bowl (B),
and press firmly enough so the wax ring (CC*)
adheres to the bowl (B).
4. Position Toilet Bowl (B) on Toilet Flange, (Figure 3)
• Unplug waste opening in toilet flange. Gently place
toilet bowl (B) (right side up) in position with the
floor bolts (AA*) protruding up through the holes in
the base of the toilet bowl (B). Level toilet bowl (B)
as it is lowered onto the toilet flange.
• Once toilet bowl (B) is in position, press down with
a slight twisting motion on the top center of the
bowl (B); eventually applying full body weight to
evenly compress the wax ring (CC*), creating a
water-tight seal. (Do not rock the bowl
back-and-forth as this may break the seal.)
• Make sure the toilet bowl (B) is as level as
possible. It may be necessary to use small wedges
(shims) under the edge of the bowl due to slight
variations in vitreous chinaware or uneven floors.
(Toilet bowl (B) should be firmly seated on the
floor, so it does not wobble or rock.)
5. Secure Bowl to Floor, (Figure 4)
• Place plastic disc (DD*) (Note: "THIS SIDE UP"),
metal washers (EE*) and nuts (FF*) on floor bolts
(AA*). Alternately tighten nuts (FF*) until toilet bowl
(B) is firmly seated on floor.
• DO NOT OVERTIGHTEN NUTS (FF*) BECAUSE
VITREOUS CHINA CAN EASILY CRACK OR
CHIP.
• Pour water into toilet bowl (B) to prevent the
escape of sewer gases.
• Using a hacksaw, cut off excess length of floor
bolts (AA*) so bolt caps (GG) will fit. (Leave no
more than 1/4-in length above nuts (FF*)). Place
bolt caps (GG) over floor bolts (AA*) and press
down for secure fit.
*AA, CC, DD, EE, and FF not included.
Figure 2
Figure 3
Figure 4