- ページ 13

電動工具 AGT CV75RのPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。AGT CV75R 19 ページ。

Maintenance and inspection

Periode
Before starting
Periodically
Every 5 Working hours
Every 25 Working hours
Every 50 Working hours
Every 100 Working hours
Every 300 Working hours
*)
Sight glass :
When the machine is horizontal, the sight glass must be filled with oil.
Also see engine manual or contact your dealer.
-
Keep the machine horizontal to lessen chance of spoiling oil.
While transporting the machine keep the gas valve closed.
-
Procedure
-Check the fuel level
-Check the ramming system lubrication
with sight glass*
-Check the engine oil
-Check for lose screws, nuts etc
-Clean engine cooling fins
-Check air filter
-Check spark plug
-Check shoe hardware
-Replace air filter
-Change oil ramming system once
Then after every 300 working hours
-Replace sparkling plug
-Replace engine oil
-Complete maintenance by your dealer

Transport