8. Drive Band
Required:
1 - Green drive band (in the hardware bag)
9. Crank Assembly
Required:
3 - Silver 32mm (1 1/4") screws (in the hardware bag)
Posidrive screwdriver
The drive wheel has been predrilled with the holes for the aluminium crank assembly. You will need a
posi-drive screwdriver and the three 32mm silver screws. Make sure the drive belt is on.
7d
The green drive band goes on the grooves on the drive wheel and
then through one of the grooves on the pulley. It is important that
the drive belt is reasonably tight otherwise the treadling will feel
heavy.
8b
8
8a
9a
majacraft