- ページ 5

室内暖炉 Majestic fireplaces FireStage UVSRC36AのPDF ホームオーナーズ・インストレーション&オペレーティング・マニュアルをオンラインで閲覧またはダウンロードできます。Majestic fireplaces FireStage UVSRC36A 12 ページ。 Vent-free firebox
Majestic fireplaces FireStage UVSRC36A にも: パンフレット&スペック (6 ページ), ホームオーナーズ・インストレーション&オペレーティング・マニュアル (16 ページ)

Majestic fireplaces FireStage UVSRC36A ホームオーナーズ・インストレーション&オペレーティング・マニュアル
3a
5" Min.
Combustible
Perpendicular Wall
3b
Clearances
without Canopy
6"
Noncombustible
Material
9 "
Min.
Fireplace
Opening
Fig. 3 Clearances to combustibles.
opening and a 10" projection at 24" above the
opening. (Fig. 3b and 3c)
To install the optional canopy, you will need a
phillips screwdriver. The canopy has four holes
along the top edge. The middle two holes are
smaller than the outer two holes. Remove the
four (4) screws in the upper channel (to front
edge) of the firebox. The canopy will fit tightly in
the top front edge of the fireplace opening. Attach
the canopy with the four (4) sheet metal screws
previously removed from the upper channel.
4. Floor Clearances: No clearance is required if the
appliance is installed per these instructions.

Installing the Firebox

This list of specific instructions will help you make
certain that every installation operation is done cor-
rectly. Complete the installation steps in the sequence
shown.
LOCAL BUILDING CODES SHOULD BE CONSULTED
IN ALL CASES AS TO THE PARTICULAR REQUIRE-
MENTS CONCERNING THE INSTALLATION OF
FACTORY BUILT FIREPLACES.
Select the location for the fireplace by taking into
consideration the factors previously outlined in the
Choosing the Location section of the manual.
20007435
3c
Clearance to Combustible Mantel
Projections without Canopy
42"
10"
24"
Min.
16"
Min.
FP604a
24
22
20
18
16
14
12
10
8
2
4
6
8
10
Mantel (Combustible)
Projections (")
Step 1: Framing the Firebox
The width of the framed opening must be 39 " for
UVSRC36A or 45 " for UVSRC42A. (Fig. 4)
The entire fireplace can be elevated above the floor to
achieve a raised hearth effect. This can be done by
adding a small platform to achieve the desired height.
NOTE: See pre-wiring of Junction Box and Electrical
Services on Page 7.
Step 2: Install the Firebox
Install the firebox into the framed opening by setting it
directly in front of the opening and sliding it into the
proper position.
Step 3: Level the Firebox
Check the level of the firebox on the top edge of the
fireplace face. Shim if necessary.
Step 4: Secure the Firebox
Secure the fireplace to the framing. The nailing flanges
on the firebox will make securing the firebox to the
frame quick and easy. Use appropriate size nails or
screws to secure the firebox.
Step 5: Gas Piping and Connection
The gas piping must be installed in accordance with
local codes or, in the absence of local codes, in accor-
dance with the National Fuel Gas Code, ANSI Z223.1/
NFPA 54, latest edition.
UVSRC Vent-Free Fireboxes
3d
Clearance to Combustible Mantel
Projections with Canopy
22
20
18
16
14
12
10
8
6
2
4
6
Mantel (Combustible)
Projections (")
*Combustible projections above
the fireplace must be within the
area described by the dashed line.
8
10
T225
5