2.0. BOILER POSITIONING AND ASSEMBLY
Boiler positioning and assembly and building in must be performed by a qualified person. We
recommend that boiler is placed on a concrete base having height of 50 to 100 mm above the
floor. Boiler room must be frost-proof and well ventilated. Boiler has to be positioned so that it can
be properly connected to the chimney (see point 4.0) and simultaneously, enabling tending of
boiler and additional equipment, control during operation, and cleaning and maintenance (see
Figure 1).
WARNING!
Flammable items must not be placed on the boiler and within the safety distances shown
in Figure 1.
Figure 1. Minimum distance from the room walls
Legend:
-
1
Boiler EKO-CK P
-
2
Pellet burner CPPL
Technical instructions EKO-CK P
6
min. 1000 mm
-
Pellet control unit CPREG
3
-
Pellet feeder CPPT
4
Boiler positioning and assembly
1
5
3
4
min. 750 mm
2
min. 100 mm
-
Pellet tank CPSP
5
-
Chimney
6
5