- ページ 10

ストリング・マシン Gamma X-6のPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。Gamma X-6 16 ページ。
Gamma X-6 にも: オーナーズマニュアル (15 ページ)

Gamma X-6 オーナーズマニュアル
STRINGING THE FRAME
Clamping the String
Clamp the tensioned string to the next ad-
jacent string using the second string clamp.
Release the string from the gripper by raising
the tension arm.
Repeat the procedure for all of the remaining
main strings and tie off following the racquet
manufacturers recommendations.
Weaving the Cross Strings
Follow the manufacturer's recommended
stringing pattern for one or two piece stringing.
This will determine the starting point for the
cross strings. If applicable, tie the fi rst cross
string using an appropriate starting knot.
Weave the cross strings over and under the
main strings being careful to alternate the
weave of each consecutive cross string so
as to be opposite of the previously installed
cross string.
Completing the String Job
Once the fi nal cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fi ed by the racquet manufacturer.
Remove the frame from the mounting system
by loosening the shoulder supports and
frame supports.
10