- ページ 10
アクセサリー Gamma Progression ST IIのPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。Gamma Progression ST II 19 ページ。
Gamma Progression ST II にも: オーナーズマニュアル (17 ページ)
STRINGING THE FRAME
Pulling Tension
Wrap the loose section of string once around
the roller guide and insert the string between
the diamond dust coated string gripper plates.
Pull the string perpendicular to the gripper
plates while slowly rotating the tensioner
crank clockwise until the brake lever pops
out of the latching block. The string is now
tensioned and can be clamped in place with
the remaining fi xed clamp.
Repeat the above steps until all main strings
are installed. Tie off ends of main strings as per
racquet manufacturers recommendations.
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the fi nal cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fi ed by the racquet manufacturer.
11