- ページ 11

ゲートオープナー Centurion R5のPDF クイック・セットアップ・マニュアルをオンラインで閲覧またはダウンロードできます。Centurion R5 19 ページ。 Rotary swing gate operator
Centurion R5 にも: クイック・セットアップ・マニュアル (2 ページ), クイック・セットアップ・マニュアル (17 ページ)

Centurion R5 クイック・セットアップ・マニュアル
WARNING
1
C
ONNECT ALL
Connect all cables as required to the control card and battery charger (See
Figure 11 & 12). (IM page 48 & 49)
Check that the power source jumper is in the correct position. (PSU or STD
refer to IM page 27, Fig. 24)
Isolator
Box
1
2
To dwelling
6
Figure 9 Cabling Requirements
1. Always check that the circuit breaker in the electrical panel is in the
OFF position, and that all high voltage circuits (more than 42.4V) are
completely isolated from the mains supply before doing any work.
2. Ensure that all low voltage systems (Less than 42.4V) are suitably
protected from damage, by disconnecting all sources of power such
as chargers and batteries before doing any work.
3. All electrical work must be carried out according to the requirements
of all applicable local electrical codes.(It is recommended that a
licensed electrical contractor perform such work.)
W
IRING
4
5
3
Electrical Set-Up
Electrical Set-Up
7
6
11