![Major tech MT550 取扱説明書](/uploads/products/server2/2056337/2056337.jpg)
CABLES
Disconnect the cable from the line. Also disconnect opposite end to avoid
errors due to leakage from other equipment. Check each conductor to
ground and /or lead sheath by connecting one megohmmeter lead to a
ground and /or lead sheather and the other megohmmeter lead to each
of the conductors in turn. Check insulation resistance between conductors
by connecting megohmmeter leads to conductors in pairs.
10 10