- ページ 2

ラック&スタンド Green Creative T-GRID PRO NCPLATE/TのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Green Creative T-GRID PRO NCPLATE/T 2 ページ。

T-GRID NEW CONSTRUCTION PLATE
SPECIFICATIONS
INSTALLATION GUIDE
1.
4.
Step 1.
Using cutting pliers, remove any CKO sections necessary to
install the downlight. (fig. 1)
Step 2.
Place the NCPLATE/T on top of the T-Grid tile where the down-
light will be installed. Screw the NCPLATE/T to the sides of the
T-Grid through the plate's flange holes. (fig. 2)
SPECIFICATIONS
Product
Model
Type
TITANIUM LED SERIES 2.0
2.
5.
Step 3.
Step 4.
New Construction Plate for T-Grid ceilings
3.
Once the plate is attached to the T-Grid, cut a hole in the tile
following the inside of the selected CKO. (fig. 3)
Follow appropriate downlight installation instruction to com-
plete the installation. (fig. 4 & 5)
97983
NCPLATE/T