- ページ 8

トリマー CenturionPro GC1のPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。CenturionPro GC1 14 ページ。 Buckers
CenturionPro GC1 にも: オーナーズマニュアル (14 ページ)

GC3
ASSEMBLEY TO THREE STANDS
STEP 1:
MOUNT BUCKER
ONTO TRIPLE
STAND
A) Line up existing holes on the
Bucker to the holes on the
adapter plate. Attach using:
4 - 3/8" x 1" bolts
4 - 3/8" nuts
4 - 3/8" x 7/8" washers
B) Line up existing holes
on the stand to the
holes on the adapter
plate. Attach using:
7 - 3/16" x 0.75" bolts
STEP 3:
CONNECT FLEX
DUSTING HOSE
TO BLOWER
A) Attach 3-head diverter to
blower using: 1 - 0.25"
phillips head screw
B) Attach the other end of
the flex dusting hose
from each Bucker, to
the Blower's diverter
ports by securing it
with a 3" hose clamp.
3" hose clamp.
8
1 855 535 0558
*Ensure machine is unplugged before cleaning.
STEP 2:
CONNECT FLEX
DUSTING HOSE
TO BUCKER
Attach flex dusting hose
to all 3 workstations on
bottom of Bucker using
??? screws.
STEP 4:
REASSEMBLE
BUCKER
Re-assemble bucker in
reverse order.
cprosolutions.com
3" hose clamp.