- ページ 4

ヒーター AGUZZO Streamline S75L533PのPDF インストレーション・インストラクションをオンラインで閲覧またはダウンロードできます。AGUZZO Streamline S75L533P 5 ページ。 304 stainless steel heated towel rail

Installation

STEP 1: Install Mounting Plates
STEP 2: Hard Wire Connection
If hard wiring, an electrician must complete the power connection to a
wall switch or controller.
If you have a Hard Wire Streamline
model the power supply cord must
be connected by a licensed
electrician. The power cord is to be
fed through the centre of the wall
mounting plate into the wall cavity for
connection to a wall switch or
programmable timer/controller.
STEP 3: Affix appliance to wall
Based on the size of the
heated towel rail,
measure and mark hole
positions on your wall.
Drill holes into the wall
and securely fasten the
mounting plates with two
supplied wall plugs and
screws for each mounting
plate or other appropriate
fastners for your wall
composition.
Fasten appliance to
wall. Position mounting
plate covers and heated
towel rail brackets over
the installed mounting
plates. Fasten to the
mounts securely by
tightening the grub
screws on each bracket.
Unless you are installing
a hard-wire model, plug
the cord into a power
point.