- ページ 10

農機具 Green Frog Designs Chicken Run 2x2のPDF マニュアルをオンラインで閲覧またはダウンロードできます。Green Frog Designs Chicken Run 2x2 17 ページ。

1
Note: Whilst building, joints should be tapped home
with a wooden or rubber mallet. If you only have a metal
hammer, protect the parts with a piece of wood.
Note: Your layout may differ to the following images
depending on your model. See layout diagrams on
previous pages.
3
Stand the back wall vertical, and then build and attach
the left side frame using 2m bars, 3-way Corner Joints
and 4-way Edge Joints.
5
Make sure to slide the 2 Door Hinge Holders (rotated
as shown above) onto the upright from which the door
is to hang, prior to assembling it.
Printed on recycled paper
RUN FRAME ASSEMBLY
© Green Frog Designs Limited 2016
2
Build the back wall using 2m bars, 3-way Corner Joints
and 4-way Edge Joints. Build it flat on the ground, with
the unused lugs facing upwards.
When Electric Fencing is being used, all four Corner
Bar Attachments should be fitted when the frame is
being constructed.
4
Gradually assemble the rest of the frame one panel at a
time. Middle uprights for the 4x4 and 4x6 runs have 5-
way joints (D) at the top and a Spiked Foot (E) at the
bottom.
6
The panel with the door should look similar to this. If
Electric Fencing is being used, a Corner Bar
Attachment replaces the lower Door Hinge Holder.
Page 10 of 17