- ページ 7
防犯カメラ HIKVISION TURBO HD DS-2CE56C5T-IT3ZのPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。HIKVISION TURBO HD DS-2CE56C5T-IT3Z 16 ページ。 Dome & turret camera
2.2 Ceiling Mounting of Type II Camera
Before you start:
The installation steps of ceiling mounting and wall
mounting are similar, and the following takes ceiling
mounting as an example to describe the steps.
Steps:
1. Paste the drill template to the place where you want
to install the camera.
2. Drill the screw holes according to the drill template,
and the cable hole (optional) on the ceiling.
Note:
Drill the cable hole in the center of the drill template,
when adopting ceiling outlet to route the cable.
3. Loosen screws to remove the clip plate, and take out
the main body.
4. Install the mounting base to the ceiling with
supplied screws.
Figure 2-9 Install the Mounting Base to the Ceiling
Note:
The supplied screw package contains self-tapping
screws, and expansion bolts.
For cement wall/ceiling, expansion bolts are
required to install the camera. For wooden
wall/ceiling, self-tapping screws are required.
5. Route the cables through the cable hole, or the side
opening.
6. Install the main body to the mounting base and
insert the clip plate.
Figure 2-7 Drill Template
Figure 2-8 Remove the Clip Plate