- ページ 4
配管製品 Kohler Symbol Rite-Temp K-T18490のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Kohler Symbol Rite-Temp K-T18490 28 ページ。 Bath and shower trim
Kohler Symbol Rite-Temp K-T18490 にも: ホームオーナーズマニュアル (28 ページ)
1. Install the Spout
Remove the temporary nipple.
Apply thread sealant and install a 1/2" nipple so it extends 7/16"
(1.1 cm) beyond the finished wall.
Apply a bead of plumbers putty or other sealant around the inlet
end of the spout according to the manufacturer's instructions.
Apply thread sealant to the nipple and thread the spout onto the
nipple.
Carefully tighten with a clean strap wrench.
Remove any excess putty.
1054205-2-B
1/2" Nipple
7/16"
(1.1 cm)
Apply plumbers
putty.
4
Kohler Co.