- ページ 10

配管製品 Kohler VIA K-20629T-BWのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Kohler VIA K-20629T-BW 30 ページ。 Vitreous china wall-hung p-trap toilet
Kohler VIA K-20629T-BW にも: 取付説明書 (11 ページ), 取付説明書 (24 ページ), 取付説明書 (38 ページ), 取付説明書 (28 ページ)

Kohler VIA K-20629T-BW 取付説明書
K-78076T-PNE/K-78076K-PNE/K-78077T-PNE/K-78077K-PNE/K-78077T-RES/
K-78077T-ESS/K-78077T-VLS/K-78077T-VLSL/K-78077T-VL130/K-78077T-VL150
478 3
440 3
Height to floor is decided by bowl.
Finished Floor
Floor Discharge Installation Method
Three discharge pipe installation methods based on actual
situation: A, B, C, adjust position by screw driver. Snap
discharge pipe lower end into discharge port.
1288805-T01-B
Method one:
Press from front
Air hose
88 2
K-20341T-PNE
225 1
A B C
Kohler reserves the right to change marked dimensions without prior notice.
Installed with K-20341T-PNE
K-20341T-PNE
Method two:
Remote plate installation
18~62
Suggested faceplate
installation area
R1000mm
Air hose
K-75890T-PNE
225 1
Discharge
Elbow
Discharge
Elbow
Discharge
Elbow
-5-
Method three:
Remote installation of mask
Suggested faceplate
installation area
R1000mm
Pinch
plate
Air hose
K-23055T-PNE
K-23056T/K-23056TW
51 1
A
Drain outlet
B
Drain outlet
C
Drain outlet
110mm
225 1
Water Tank
Bracket
90mm, welding
90mm
Water Tank
Bracket
110mm
110mm
Water Tank
Bracket
110mm, welding