- ページ 3
バスルーム設備 Kohler Sonata K-1677のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Kohler Sonata K-1677 17 ページ。 Acrylic shower modules
Construct 2x4 or 2x6 stud framing according to
the roughing-in information
If necessary, leave one of the framing side walls
loose until you move the module into position
Position the
rough
plumbing
Measure and cut
the drain hole
Verify that the subfloor offers adequate
support, and is flat and level
1. Construct the Framing
NOTICE: Unless otherwise specified, floor support under the module must provide for a minimum of 80
lbs./square foot (390 Kg./square meter) loading.
NOTE: Refer to the shower door installation instructions for any special framing considerations.
- Make sure the flooring offers adequate support for your shower module, and verify that the subfloor is flat and
level.
- Construct a 2x4 or 2x6 stud recess according to the roughing in information packed. Provide double or triple stud
framing around the recess opening. Make sure the header is level and square.
- If necessary, leave one of the stud recess walls loose until you move the module into position. Then line the recess
wall up with the module, and secure the recess wall permanently in place to the stud framing.
- Add any bridging or support needed for extra grab bars or towel bars. Refer to the accessory manufacturer's
instructions.
- Measure and cut the drain hole opening in the floor, and install the rough drain lines. Install the rough plumbing.
Refer to the roughing in information packed.
Kohler Co.
Construct 2x4 or 2x6 stud framing according to
the roughing-in information
If necessary, leave one of the framing side walls
loose until you move the module into position
Measure and
cut the drain
hole
Verify that the subfloor offers adequate
support, and is flat and level
3
Position the
rough
plumbing
C
1013850-2-