- ページ 14
トイレ Kohler ESCALE K-24838T-SのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Kohler ESCALE K-24838T-S 24 ページ。 Vitreous china wall-hung p-trap toilet
Kohler ESCALE K-24838T-S にも: 取付説明書 (24 ページ), 取付説明書 (45 ページ)
D. Installation of Cover
1. Open the inlet corner valve located inside the frame.
2. Fix the adjustable board to the wall by tightening the
lock nut as shown in the figure. And the locknut should
be directly put on the position of the sign of LOCK.
(Indications are marked on the adjustable board, please
refer to indications in installation)
NOTE: The locknut could be cut to a proper length if
necessary.
3. Tighten the long screw to the bolt through the hole.
WARNING:
The sign on the long screw should accord with the
hole when the long screw is tightened. The end w/o
mark of the long screw could be cut to meet the
requirements of installation dimensions. And make
sure the long screw would not bump any other parts.
3.
警告:
长螺杆可根据实际安装尺寸视需要切除有
螺纹的一端,保证长螺杆运动时不与其他部
件相碰。
4. Connect the connector on the cover with the connectors
in the tank.
4. 将面板上接头与水箱内电机线的面板连接头相连。
1359749-T01-A
Lock Nut
D.
1. 打开水箱内部进水角阀。
2.
如图将调节板装在墙壁上,然后用手旋转锁紧管使调节板固
定。锁紧管需对准"LOCK"标识。(调节板已有标识,安装时
请按标识进行)。
注:若锁紧管因不同的安装与其他部件相碰,可根据实际情况
作适当切除。
Adjustable Board
Hole
Sign
-9-
Long Screw
Connector, Cover
面板连接头
Connector, Cover
面板连接头
Connect Low
Voltage Power
Supply
接低压电源