- ページ 9
産業機器 AQC MAXIREACH EBD-61005のPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。AQC MAXIREACH EBD-61005 16 ページ。 Pivoting extension boom

Pivoting Extension Boom
9.1
Required tools
The following tools and equipment are required for the assembly of the swing boom:
• Crane or lift truck
• Chains
• Slings
• Shackles
• Eye bolts
• Spikes
• Wrench
Other tools may be required. It is advised to obtain services from a qualified contractor with
appropriate equipment for proper installation.
9.2
Assembly (boom base pivot)
1 . Prepare the area where the swing boom will be installed making sure it is clear and free of
any obstacle.
2 . Install boom base at appropriate or specified height. It is suggested to use minimum grade
5 fasteners to support boom base on support structure. Boom base may also be welded to
support structure when permitted. CAUTION: Boom base has to be installed level (horizontally
and vertically) to prevent "coasting" of horizontal steel tube.
6" (150MM) DIAMETER BOOM BASE DIMENSIONS
31.29/795
11.69/297
23.5/594
7/178
• Sockets
• Power drill
• Concrete drill bit
• Anchors
• Bolts
• Self tapping screws
33.39/848
9