- ページ 8
無停電電源装置 a-TroniX Extended Battery Pack ProのPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。a-TroniX Extended Battery Pack Pro 14 ページ。
User Manual
Extended Battery Pack 6kVA, 10kVA
3.3. Installing and connecting the batteries
40/36/32 pieces of batteries can be selected to divide them into two strings that are
connected in parallel for operation.
Each string has 20/18/16 batteries in series (BAT+ N BAT -).
The installations of the three voltage types are described as follows:
Instructions for installing and connecting 40 pieces of batteries:
Insert the batteries one after the other from bottom to top and then connect the battery
cables according to the following wiring diagram.
Wiring diagram for the installation of 40 batteries
Page 8
09/2021