- ページ 10

エア・ハンドラー ABACO MACHINES BH3TのPDF 操作マニュアルをオンラインで閲覧またはダウンロードできます。ABACO MACHINES BH3T 16 ページ。

Step 2: Move the lifting item between two Lifting arms and
hang the lifting item together by straps (figure 2).
Note: Pay attention to the balance of the lifting item.
Figure 2
Step 3: Lift and put the lifting item into the container.
Figure 3
Caution:
1) Make sure the lifted item is balanced horizontally, if not adjust
the anchor points.
2) After lifting the item for about 4 inches (10 cm) check all the
items specified in the previous column of General Caution of
Operations once again.
Warning: Check the Bundle Handler before and after operations
minutely for the following:
1) Inspect all the bolts and nuts are duly fastened.
2) Mechanical parts are all functional.
3) There are no distortion of the component construction.
4) All the welded joints are free from cracks, undercuts, cracks etc.
BH3T - Operation Manual
ABACO MACHINES -All Rights Reserved
7