Pre - Installation Requirements
Water Pressure Requirement
As the bath requires a Thermostatic Mixing Valve, which has been manufactured to NHS
engineering specification D08, and approved under the TMV scheme, please read the
following which outlines how a TMV may affect the use of your bath.
The working parameters of the TMV require a water pressure of 1-5 bar with a maximum
pressure loss ratio of no greater than 10:1 between hot and cold feeds. The maximum bath
water temperature according to D08 is no higher than 43°C and the maximum for the
shower is 39°C.
It is important to note that a pressure difference between hot and cold pipes will have a great
effect on the time it takes to fill a bath, i.e;
Hot water 1.4 bar and Cold water 2.4 bar = Approx. 9min. to fill with 180 litres
Hot water 2.2 bar and Cold water 2.2 bar = Approx. 5min. to fill with 180 litres
If in doubt a pressure test should be carried out prior to installation of the bath, and if required
a booster pump or pressure reducing valve fitted, as required.
Note - It is a requirement that at least 4 firm fixings are made in the head end
base plate and 2 firm fixings in the foot end base plate. The table below shows
*Sleeve bolts will not grip unless the hole is cleaned out first
**Plugs to be fixed into lower section of floor and not floating section
Should you experience difficulties please call our Technical Support Line 0870 066 0809
POWER BATH FLOOR FIXING KIT (Supplied with Bath)
M10 x 70mm Sleeve Bolts
M8 x 70mm Coach Screws
10 x 50mm Nylon Fixing Plugs 4
White Hole Cover Plugs
which type of fixing should be used based on the flooring.
Base Plate Fixings
M8 Coach Screws
M8 Coach Screws with nylon Plug
*Sleeve Bolts
M8 Coach Screws with nylon Plug**
M8 Coach Screws with nylon Plug
*M10 Sleeve Bolts
Contents Pack
Floor Material
Joist & Noggin
Brick & Block
Block & Beam
6
4
4
Compound
Floating
Concrete
7