- ページ 6
スイッチ Allied Telesis AT-9812T V2のPDF クイック・インストール・マニュアルをオンラインで閲覧またはダウンロードできます。Allied Telesis AT-9812T V2 10 ページ。 At-9800 series switch
6
d)
Ensure that there are no exposed conductor strands.
e)
Secure the supply cable to the rack framework or similar object so that
the connections are isolated from any forces applied to the cable.
f)
Ensure that the circuit breaker is in the OFF position.
g)
Connect the supply cable wires to the circuit breaker.
h)
Energise the circuit breaker.
The Fault LED should flash for approximately 10 seconds as the switch runs
internal tests. If the LED continues to flash or remains lit, refer to the AT-9800
Series Switch Hardware Reference for troubleshooting information.
9.
Check that the Power LED on the switch's front panel lights green
If the LED fails to light, refer to the AT-9800 Series Switch Hardware Reference
for troubleshooting information.
10. Connect the Redundant Power Supply (Optional)
AC models of AT-9800 Series switches have a Redundant Power Supply
(RPS) connector on their rear panel, and can be used with an AT-RPS9000
Redundant Power Supply. The AT-RPS9000 must be purchased separately.
Contact your authorised Allied Telesis distributor or reseller for more
information.
11. Install GBICs
Any combination of copper and fibre GBICs can be installed in AT-9812T
and AT-9816GB switches. Slide the GBICs into the GBIC slots. Press each
GBIC firmly into place.
A range of GBICs have been tested and approved for use with AT-9800 Series switches.
For more information, contact your authorised Allied Telesis distributor or reseller, or
visit www.alliedtelesis.com.
RX and TX terminal locations on SC fibre GBIC ports are the reverse of RX and TX
terminal locations on fixed SC fibre ports. When looking at an SC fibre GBIC from the
front, the RX terminal is on the left and the TX terminal is on the right.
12. Connect the data cables
Make sure each cable connection is secure. The switch will now perform
basic Layer 2 switching functions.
AT-9800 Series Switch
C613-04038-01 REV H