- ページ 3
ゲートウェイ Billion SG6300NZLのPDF クイック・スタート・マニュアルをオンラインで閲覧またはダウンロードできます。Billion SG6300NZL 20 ページ。

Chapter 1: SG6300NZL Hardware Installation
1.1 SG6300NZL Overview
1
Power
2
LAN
3
WAN
4
USB
5
Wi-Fi
6
ZigBee
7
RS485
8
WWAN
SG6300NZL Front Panel LEDs
Green: Power ON
Red: System failure. Restart the device or contact
Lit up:
Successfully connected with a broadband connection device
Blinking:
Data being transmitted/received
Lit up:
Successfully connected with a broadband connection device
Blinking:
Data being transmitted/received
Green:
Connecting to a USB dongle or a hard drive.
Lit up:
Successfully connected with a broadband connection device
Blinking:
Data being transmitted/received
Flashes about once every 3 seconds when the wireless
connection is established.
Flashes about 3 times per second when the device is set to the
state waiting for being joined by other smart meters.
Green:
Build up the connection between Gateway and RS485 device
4G LTE status
Green: Excellent signal condition
Green flashing quickly: Good signal condition
Orange flash quickly: Fair signal condition
Orange flash slowly: Poor signal condition
Orange: No signal
www.billion.com.tw
www.smartgrid.com.tw