- ページ 2

水ポンプ DGSI TR-977のPDF クイック・スタート・マニュアルをオンラインで閲覧またはダウンロードできます。DGSI TR-977 2 ページ。 Srx-r pumps

Internal foam packaging
4. Now remove the pump body by simultaneously twisting the valve assembly
and pulling at the same time until the pump and the body easily separates.
5. Once separated, remove the upper-and-lower protective foam packaging.
Note: This packaging is provided to protect both the float and control rod from
damage during shipping. DGSI recommends that you save this packaging as
well as the box for any future shipping requirements.
To reassemble the pump, follow the above steps in reverse order. When
installing the bottom check-valve, it is recommended that you stand the pump
upside-down on the discharge hose-barb, then tighten the two bolts to pull the
O-ring seals into place.
Additional drawings and parts lists can be found at www.DGSI.info
Note: Some parts
listed are sold
only as a kit.
Maintenance
To clean the internal components
of the pump, remove the housing
as outlined in steps 1 – 4 in Packing
and Unpacking, then remove the
cotter and clevis pins from the
bottom assembly before sliding
the "T" assembly from the center
discharge tube.
The control rod and float can
now be removed for cleaning.
The float springs must first be
removed from the float (see
illustration below, #29).
Remove the barbed fittings to
clean the exhaust and air-inlet
valves from any debris.
To reassemble the pump, follow the above steps in reverse order.
Warning: Any further disassembly should be carried out by DGSI.