- ページ 10

サーバー Dell VEP4600のPDF セットアップマニュアルをオンラインで閲覧またはダウンロードできます。Dell VEP4600 23 ページ。
Dell VEP4600 にも: インストレーション・マニュアル (40 ページ), インストレーション・マニュアル (40 ページ)

Dell VEP4600 セットアップマニュアル
To install VEP4600, complete the installation procedures in the order presented in this
section.
Always handle the platform and its components with care. Avoid dropping the platform or
any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the platform and its
components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this platform.
Topics:

Unpack

Ground cable
Rack or cabinet installation
Two-post installation
Four-post installation
Optics installation
Platform power-up
Unpack
NOTE:
Before unpacking the platform, inspect the container and immediately report
any evidence of damage.
When unpacking VEP4600, make sure that the following items are included:
One VEP4600
One RJ-45 to DB-9 female cable
10

VEP4600 installation

VEP4600 installation
3