- ページ 14

サーバー Dell VEP4600のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Dell VEP4600 40 ページ。
Dell VEP4600 にも: セットアップマニュアル (23 ページ), インストレーション・マニュアル (40 ページ)

Dell VEP4600 インストレーション・マニュアル
The cabinet must meet minimum size requirements. Airflow must be in accordance with the Electronic Industries Alliance (EIA)
standard. Ensure that there is a minimum of 5 inches (12.7 cm) between the intake and exhaust vents and the cabinet wall.

Rack mounting

When you prepare your equipment rack, ensure that the rack is grounded.
Ground the equipment rack to the same ground point the power service in your area uses. The ground path must be permanent.

Platform ground

Dell EMC recommends you ground your platform. Use the VEP4600 in a common bond network (CBN).
Connect the grounding cables as described in the VEP4600 installation section. .

Fans and airflow

The VEP4600 supports fan units with airflow from front to back.
Fan combinations
The fan speed varies based on internal temperature monitoring. The VEP4600 never intentionally turns off the fans.
Table 5. Ventilation specifications
Ventilation clearance requirements
Horizontal (table top) placement
Vertical (rack) placement
For more information, see Fans.

Power

Connect the platform to the applicable power source using the appropriate power cable. An AC power cable is included with the
platform.
When installing an AC platform, follow the requirements of the National Electrical Code, ANSI/NFPA 70, where applicable.
The platform is powered-up when you connect the power cable between the platform and the power source. For more
information, see
Power
supplies.
CAUTION:
Always disconnect the power cable before you service the power supply slots. The platform has
multiple power cables. Before servicing, ensure that all power cables are disconnected.
CAUTION:
Use the power supply cable as the main disconnect device. Ensure that the socket-outlet is located
and installed near the equipment and is easily accessible.
ACPI on/off button
The ACPI (Advanced Configuration and Power Interface) on/off button is on the I/O-side of the platform.
ACPI button options:
14
Site preparations
Minimum of 5 inches (12.7 cm) of clearance between the
unit's exhaust vents.
Minimum of 5 inches (12.7 cm) of clearance from the back
of the vertically racked unit's exhaust vents to a wall or
enclosure.