3. Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Screw-driver
3) Glove
4) Cleaning cloth
5) ESD protection
6) U3818DW Curve Sponge Jig
Item
1
2
Picture
Operation
1. Assemble MYLAR with
SHEET STIFFENER
2. Assemble G-Sync
module, Heat Sink
Module and SHEET
STIFFENER, then, fix
them by captive
screw*4
3. Lock 4 Heat Sink
Screws
1. Assemble G-SYNC
Module with I/F BD
and fix it by screw*4
- 11 -
Tools
Notes
Screw driver
(Screw
Torque-
Captive
Screw:
2-2.5
kgf)
Screw
Torque-Heat
Sink: 4-4.5
kgf)
Screw driver
(Screw
Torque: 4-4.5
kgf)