- ページ 34

ストレージ Dell S3124のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Dell S3124 45 ページ。
Dell S3124 にも: スタートマニュアル (27 ページ)

Dell S3124 インストレーション・マニュアル

Configuring a Two-Post Center-Mount

To install your switch in a two-post center-mount configuration, follow these steps.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws. See item 1 in the following illustration.
2. Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws. See item 2 in the
following illustration.
3. Repeat this procedure for the second rail.
Figure 27. Installing the Switch in a Two-Post Center-Mount Configuration

Configuring a Four-Post Thread

To install your switch in a four-post thread configuration, follow these steps.
1. For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. To remove the two
screws from each flange ear and remove each casting, use a Torx driver. See item 1 in the following illustration. Retain the
castings for future rack requirements.
2. For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. See item 2 in
the following illustration.
34
Install a S3100 Series System