- ページ 12
スイッチ Dell S4248FB-ONのPDF セットアップマニュアルをオンラインで閲覧またはダウンロードできます。Dell S4248FB-ON 29 ページ。 S4200-on series
Dell S4248FB-ON にも: インストレーション・マニュアル (47 ページ)
•
Two sets of rail kits, no tools required
•
Two PSUs
•
Four fan units
•
Two country- and region-specific AC power cords
•
S5048F-ON Set-up Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container.
3
Carefully remove the switch from the container and place it on a secure and clean
surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
Rack or cabinet installation
You may either place the switch on a rack shelf or mount the switch directly into a 19" wide,
EIA-310- E-compliant rack. Rack mounting includes four-post, two-post, round threaded
holes, or square holes. The ReadyRails system is provided for 1U front-rack and two-post
installations.
The ReadyRails system includes two separately packaged rail assemblies. To begin
installation, separate each rail assembly by sliding the inside rail out of the outside rail.
WARNING:
This guide is a condensed reference. Read the safety instructions in your
Safety, Environmental, and Regulatory information booklet before you begin.
NOTE:
The illustrations in this section are not intended to represent a specific
switch.
NOTE:
Do not the use the mounted ReadyRails as a shelf or a workplace.
Rack mount safety considerations
•
Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure,
possibly damaging the equipment and causing personal injury. Stabilize racks in a
permanent location before loading begins. Mount the components starting at the bottom
of the rack, then work to the top. Do not exceed your rack's load rating.
12
S5048F-ON switch installation