- ページ 4
スプレッダー EarthWay 2170のPDF 組立・取扱説明書をオンラインで閲覧またはダウンロードできます。EarthWay 2170 6 ページ。 Commercial broadcast spreader with side spread control
EarthWay 2170 にも: 組立・取扱説明書 (6 ページ), 組立・取扱説明書 (8 ページ), 取扱説明書 (8 ページ), 組立説明書 (12 ページ), 組立説明書 (10 ページ)
13. Install handle shaft to lower handles and pivot & bracket assembly as shown. Using 1/4 -20 x 2" bolts and
locknuts. TIGHTEN BOLTS AND NUTS NOW.
Holes are farther
Gauge & Lever
Lever Tensioning Nut
15. Install flattened end of control rod in to lever on gauge as shown. Turn to lock in place. Next push lever forward to setting "0". Align
control rod with hole in pivot bracket, pull lever backward to insert control rod through hole in pivot bracket. Now install 1/4-20 Hex nut on
to control rod.
16. Pull lever back to setting "30" as shown. Next push pivot & bracket forward so that the shut off plate in the hopper is in the full open
position. REMEMBER SETTING "30" ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT-OFF PLATE IN THE FULL
OPEN POSITION TO BE PROPERLY CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in calibration.
17. Tension on the flow control lever may be adjusted by tightening or loosening the tension nut as shown.
18. Insert agitator to pinion shaft on inside of hopper.
Note: the position of flat side of the agitator. This pin
should be installed as shown.
PAGE 4
1/4 - 20 Lock-nut
Pivot Bracket
1/4 - 20 x 2" Bolt
Long End
from one end
Control Rod
Tabbed Hole
Control Rod
Handle Shaft
1/4-20 x 1"
Hex Head Bolt
Stainless
19. Install debris screen into hopper, then insert 1/4-20 x 1"
Stainless Steel Hex Bolt thru the hole in the side wall of the hopper.
Secure with Stainless Steel lock nut - TIGHTEN WITH HAND
TOOLS ONLY
14. Install (1) 1/4-20 Hex
nut (not a locknut) on to
control rod as shown.
1/4-20
Hex Nuts
Pivot
Control
Bracket
Rod
1/4-20 Lock Nut
Stainless