- ページ 4
スプレッダー EarthWay 2170TのPDF 組立・取扱説明書をオンラインで閲覧またはダウンロードできます。EarthWay 2170T 6 ページ。 Commercial tow
broadcast spreader
EarthWay 2170T にも: 組立・取扱説明書 (6 ページ)
Gauge & Lever
Lever Tension Nut
15. Install flattened end of control rod in to lever on gauge as shown. Turn to lock in
place. Next push lever forward to setting "0". Align control rod with hole in pivot
bracket, pull lever backward to insert control rod through hole in pivot bracket. Now
install 1/4-20 regular nut on to control rod.
16. Pull lever back to setting "30" as shown. Next push pivot & bracket forward
so that the shut off plate in the hopper is in the full open position. REMEMBER
SETTING "30" ON THE FLOW CONTROL LEVER MUST PLACE THE
SHUT-OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY
CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in
calibration.
17. Tension on the flow control lever may be adjusted by tightening or loosening the
tension nut as shown.
18. Insert agitator to pinion shaft on inside of hopper.
Note: the position of flat side of the agitator. This pin
should be installed as shown.
19. Install debris screen into hopper, then insert
1/4-20 x 1" Stainless Steel Hex Bolt thru the hole in
the side wall of the hopper. Secure with Stainless
Steel lock nut - TIGHTEN WITH HAND TOOLS
ONLY
PAGE 4
Control Rod
Tabbed Hole
Control Rod
1/4-20 x 1"
Hex Head Bolt
Stainless
14. Install (1) 1/4-20 regular nut (not a locknut)
on to control rod as shown.
Pivot
Bracket
1/4-20
Regular Nuts
Control
Rod
1/4-20 Lock Nut
Stainless