Please read and observe the instructions in the operating instruction
manual and the service documents regarding installation and setting
up of this machine.
This machine must be installed by a suitably qualified person with the
appropriate electrical and plumbing qualifications in accordance with
the installation instructions supplied.
This machine must be installed in accordance with all applicable
standards and guidelines, including legal requirements and health and
safety regulations.
The machine must be commissioned and operatives trained in its use
by Miele Service or by an approved Miele Service Partner only.
Condensate can build up in the area surrounding the machine. Any
furniture and fittings in the room must therefore be suitable for purpose.
If the machine is fitted under a suitable worktop (built-under model), a
stainless steel panel must be fitted above the door aperture to protect the
worktop from moisture damage. A suitable stainless steel cover plate is
available to order from Miele.
Connection to the electrical supply must be carried out in accordance
with local and national safety regulations. The connection cable must
protected from the risk of thermal damage.
The machine is supplied with electrical cord and plug as this will make it
easier to carry out the electrical safety testes during commissioning and
after any service work. For hard-wired machines, connection should be
made via a suitable mains switch with all-pole isolation, which in the off
position ensures a 3 mm gap between all open contacts.
The plug and socket as well as the mains switch must be easily
accessible after the machine has been installed.
For added safety the machine should be protected with a residual current
device with a trip current of 30 mA.
Equipotential bonding should be carried out if required. The screw
connection point for equipotential bonding is located at the back of the
machine. Equipotential bonding and earthing must be carried out before
the machine is commissioned.
The machine can be plumbed in to the cold water, hot water,
demineralised water and drainage points without a backflow protection
device.
Use the Y-connector supplied with the machine to connect the water
intake to the machine (KW) and the steam condenser (DK).
Alternatively you can provide an additional cold water supply to connect
the steam condenser to.
Ethernet and RS232 communication modules are available as optional
extras. They are not supplied with the machine. The junction box for
these should be installed near the machine for transferring and printing
process data. These must be installed and connected in accordance with
IEC 60950.