Drainage via
drain pump
Fittings (supplied)
Payment system
Possible
extensions
Machine data
Installation should only be carried out by authorised fitters in accordance with valid regulations!
Observe installation instructions when installing machine! All rights reserved! Measurements in mm
Installationsplan PW 6055/PW 6065 AV/LP EL
Stand: 02.05.2005
Max. temperature
Drain hose (Int. dia. × wall thickness × l) [DN 22]
Hose sleeve for drain hose to be provided on site (ext. dia. x l) mm
Max. transient throughput
Max. head height (measured from base of unit)
Vented drainage required. If ventilation is insufficient, fit Miele
kit, Mat. no. 05238090.
Drain manifolds serving several machines must be of
sufficient cross-section.
Miele plinth UG/UO 5005
4 × metal angled brackets (to secure machine to plinth)
4 × screws DIN 571 (Ø × length)
4 × rawl plugs (Ø × length)
Machine must be secured if installation is on plinth!
Fixing materials for floating screed floor to be provided on site
On concrete platform
2 × metal brackets
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
Machine must be secured if installation is on plinth!
Fixing materials for floating screed floor to be provided on site
The following extensions are possible:
Installation of payment system
Installation as washer-dryer stack
Liquid dispensing
Connection to serial interface, RS 232
Width
Depth
Height
Knocked-down dimensions (W × H)
Minimum rear wall gap (measured to front of machine)
Net weight PW 6055 (PW 6065)
Dynamic floor load, max.
Max. static load PW 6055 (PW 6065)
Dynamic load, max.
Drum frequency, max.
Average heat dissipation
(dependent on ambient room temperature and programme
selected)
°C
70
mm
22 × 6 × 1500
22 × 30
l/min
26
mm
1000
mm
8 × 65
mm
12 × 60
mm
6 × 50
mm
8 × 40
mm
595
mm
700
mm
850
mm
600 × 1000
mm
1100
kg
104 (105)
N
2820
N
1380
1455
N
1365
Hz
24
W
250
Seite 11