- ページ 3

農機具 360 Yield 360 Y-DROP HAGIE DELTA BOOMのPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。360 Yield 360 Y-DROP HAGIE DELTA BOOM 11 ページ。

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
Starting at the wing fold pivot pin on
the primary boom, measure and mark
points at 59", 120", 179"; 241" and 301"
(all measurements are ±5"). Repeat for
the other primary boom.
INSTRUCTIONS 360 Y-DROP
Figure 1
Figure 2
301"
241"
179"
120"
59"
Figure 3
360YIELDCENTER.COM
HAGIE DELTA BOOM
3