- ページ 11

ゲートオープナー Allmatic HYPER 400のPDF マニュアルをオンラインで閲覧またはダウンロードできます。Allmatic HYPER 400 16 ページ。 Ambidextrous irreversible operator for swing door gates

6. INSTALLATION

6.1 DETERMINE THE INSTALLATION MEASUREMENTS (OPENING INWARDS)
Before fixing the supplied brackets it is necessary to determine the installation dimensions A and B.
Start by putting the gate in position of "CLOSED DOOR".
Choose the sizes of A and B according to your installation and in order to obtain the desired degree of opening "α". This grade shown
in the table refers to the highest possible degree of openness with the corresponding dimensions.
To anchor the piston use the brackets provided.
WARNING!
The values given in the following tables are indicative and have been calculated considering the ideal conditions with a
gate of medium size, with a uniformly distributed filling and with both the internal mechanical stoppers installed. Keep
in mind that values may vary slightly and must be checked in advance.
TABLE 7 - HYPER 400 Recommended installation dimensions
A
155
B
W ( α )
150
980 (110°)
160
987 (108°)
180
991 (100°)
200
989 (92°)
TABLE 8 - HYPER 600 Recommended installation dimensions
A
220
B
W ( α )
220
1269 (110°)
240
1288 (110°)
260
1302 (108°)
280
1313 (105°)
TOP VIEW
B
A
6-1624982 - rev.1 - 20/05/2021
160
165
982 (110°)
984 (110°)
992 (110°)
983 (105°)
986 (98°)
981 (96°)
984 (90°)
982 (90°)
230
240
1270 (110°)
1273 (110°)
1290 (110°)
1292 (110°)
1310 (110°)
1295 (104°)
1303 (101°)
1293 (98°)
EXTERNAL SIDE
OF THE PROPERTY
INTERNAL SIDE OF
THE PROPERTY
ENG
170
985 (110°)
973 (104°)
978 (102°)
973 (100°)
976 (94°)
971 (93°)
981 (90°)
976 (88°)
250
1278 (110°)
1279 (110°)
1287 (107°)
1277 (104°)
1285 (101°)
1275 (99°)
1283 (96°)
1273 (94°)
W
175
180
968 (102°)
968 (98°)
966 (91°)
964 (85°)
260
270
1269 (107°)
1267 (101°)
1265 (97°)
1263 (92°)
11 / 16