- ページ 3

産業機器 ABB BUL2のPDF ユーザーマニュアルをオンラインで閲覧またはダウンロードできます。ABB BUL2 12 ページ。 On-load tap-changers
ABB BUL2 にも: メンテナンス・マニュアル (20 ページ)

ABB BUL2 ユーザーマニュアル
The manufacturer
Hereby declares that
The products
comply with the following requirements:
By design, the machine, considered as a component of a mineral oil filled power transformer, complies
with the requirements of
Machinery Directive 89/392/EEC (amended 91/368/EEC and 93/44/EEC) and 93/68/EEC (marking)
provided that the installation and the electrical connection are correctly realized by the manufacturer
of the transformer (e.g. in compliance with our Installation Instructions)
and
EMC Directive 89/336/EEC regarding the intrinsic characteristics to emission and immunity levels
and
Low Voltage Directive 73/23/EEC (modified by Directive 93/68/EEC) concerning the built-in motor
and apparatus in the control circuits.
Certificate of Incorporation:
The machines above must not be put into service until the machinery into which they have been
incorporated has been declared in conformity with the Machinery Directive.

Manufacturer's declaration

ABB AB
Components
SE-771 80 LUDVIKA
Sweden
On-load tap-changers, type UB
with motor-drive mechanisms, types BUE and BUL
Date
2013-02-15
Signed by .........................................................................
Hans Linder
Title
Manager Tap-Changers, Local Product Group Unit Components