- ページ 4
産業機器 ABB CPS6000のPDF クイック・スタート・マニュアルをオンラインで閲覧またはダウンロードできます。ABB CPS6000 8 ページ。
ABB CPS6000 にも: クイック・スタート・マニュアル (6 ページ)
Step # 4 – Controller Connections
Connect LAN, Office Alarm, Alarm Inputs and Thermal Probes to J5, J4, J3 and J2 respectively as shown right.
Special Cables are available for these purposes if required.
Step # 5 – Rectifier Installation
To install a rectifier, remove the rectifier from all of it's packing material and unlatch the handle as shown above.
Firmly push the rectifier into the rectifier slot until the connector on the rear of the rectifier engages with the
connector at the back of the rectifier slot on the CPS shelf. The latch will pop most of the way up when the rectifier
is properly seated. Push the latch up into the latched position to complete engagement.
Step # 6 - Initial Start Up
Verify that all AC, DC and Alarm connections are complete and secure. Once this is complete, the AC input breakers
may be turned on. If rectifiers have not yet been installed, install rectifiers now as described previously. As each
rectifier is installed, the controller automatically identifies the new rectifier and begins communication.
If there are no alarms, make any adjustments to the default settings on the controller that are required for this
installation. Refer to the Pulsar Plus Product Manual for issues like web pages, craft port and changes to settings.
Most functions in software are intuitive by referring to the menu map listed in the detail Manual
Page 4
© 2023 ABB. All rights reserved.
J4 Office
Alarms
J5 LAN
J2 Thermal probes
CPS6000_Series II External Distribution_QSG
J3 Alarm
Inputs
Version 2.0