- ページ 19
溶接システム Miller XMS 403のPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。Miller XMS 403 44 ページ。 400 volts ce arc welding power source
3-14. Connecting 3-Phase Input Power
4
3
6
Tools Needed:
3
= GND/PE Earth Ground
7
2
L1
L2
L3
1
5
Installation must meet all National
and Local Codes − have only quali-
fied persons make this installation.
Disconnect and lockout/tagout in-
put power before connecting input
conductors from unit.
Always connect green or green/
yellow conductor to supply
grounding terminal first, and nev-
er to a line terminal.
For Three-Phase Operation
1
Input Power Cord.
2
Disconnect Device (switch shown in
the OFF position)
3
Green Or Green/Yellow Grounding
Conductor
4
Disconnect Device Grounding
Terminal
5
Input Conductors (L1, L2 And L3)
6
Disconnect Device Line Terminals
Connect green or green/yellow grounding
conductor to disconnect device grounding
terminal first.
Connect input conductors L1, L2, and L3
to disconnect device line terminals.
7
Over-Current Protection
Select type and size of over-current
protection using Section 3-13 (fused dis-
connect switch shown).
Close and secure door on disconnect
device. Remove lockout/tagout device,
and place switch in the On position.
input2 2008−01 − 803 766-C / 956142645-3-5
OM-244 243 Page 15