- ページ 13
スイッチ HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper SwitchのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch 28 ページ。 Fabric clustering system 24-port 4x fabric copper switch installation guide, march 2005
HP 376227-B21 - ProLiant InfiniBand 4x Fabric Copper Switch にも: ホワイトペーパー (13 ページ), 実施マニュアル (9 ページ)
Step 2. To install the switch with the bezel to the front of the rack, install with the flange at the front of the
switch.
You can also mount the flange toward the back if you want to mount the switch backward in the
rack such that the service-side is forward. If the intake for the fans on the switch faces the hot air
output of other equipment, the switch could endure thermal issues.
Attach the rail with 6 screws to each side of the switch in the locations shown in Figure 1-7
Screw locations are the same in the switch regardless of rail orientation.
Figure 1-7 Rail-to-Switch Attachment Locations
Bezel end
Figure 1-8 Attach Rail to Switch
Step 3. Repeat steps Steps 1 and 2 on the other side of the switch.
The two sliding rails should still be unattached.
Step 4. Loosely attach the switch with one screw through the front of each rail.
CAUTION
Figure 1-9 Loosely Attach Rail to Rack
CAUTION
Chapter 1
Temporarily support the switch until the sliding rails are attached.
Do not let the switch hang unsupported from only the fixed rail flanges.
HP-UX Integrity Installation Overview & Planning
Install HP Fabric Clustering System Switches
Attach rail to switch in
the (6) locations highlighted in black.
13