Pre-Installation Checklist
1. A standard electrical outlet (120V/160Hz) must be located within 12' of installation site.
2. A functioning floor drain, washer sand pipe or suitable location for waste water discharge must be located with-
in 20' of installation site.
a. All plumbing should be done in accordance with local plumbing codes. The pipe size for the drain line should
be a minimum of 1/2". Backwash flow rates in excess of 7 gpm or length in excess of 20' require 3/4" drain line.
3. It is recommended a working pressure reducing valve be installed on the inlet water line that supplies the water
filter
4. Note: The warranty is void if the system is exposed to water pressure in excess of 100 psi and/or water tem-
peratures in excess of 95° F
5. Important: Protect your Fitler and the entire drainline from freezing temperatures. The temperature at the loca-
tion of the system should never be below 40° F
WARNING! DANGER: If your unit should freeze, do not attempt
Installation
1. Floor Space: Make sure the floor space that has been selected to install the water filter is clean and
on a level surface. In some cases, your media may be shipped seperatelty. Place media Tank in rela-
tive position of end install, and see "Media Fill/Replacement" on page 8.
2. Leveling the System: Mineral tanks are fitted with an adjustable leveling base, if tank is not vertical/
straight lift tank 1-3 inches off the floor and gently release tank back on to the floor (repeat until stright
up and down).
3. Connection Kit: The standard connection kit supplied with the water softener will be a 1" plastic el-
bow connection kit. (See Figure 1) Other connection kits are available.
4. Plumbing Preparations: Unscrew the two plastic nuts (#1) and pull on the two brass connectors
(#4) to remove them from the bypass assembly. Next remove the white plastic rings (#2) and the
O-rings. (#3) (See Figure 2)
• Solder at least 6" of pipe to the brass connectors before reassembly. (See Figure 2)
• After soldering is complete, cool the pipe and connectors. Slide the plastic nuts (#1) over the brass connectors (#4). Place
the white plastic split rings (#2) into the grooves closest to the end of the brass connectors (#4). Reassembly the connection
kit onto the bypass assembly.
Warning: When assembling the installation-fitting package (inlet and outlet), connect the fitting to the plumbing system first
and then attach the nut, split ring and O-ring. Heat from soldering or sol- vent cements may damage the nut, split ring or o-
ring. Solder joints should be cool and solvent cements should be set before installing the nut, split ring and O-ring. Avoid getting
primer and solvent cement on any part of the O- rings, split rings, bypass valve or control valve.
5. Plumbing: When connecting the water filter to the existing plumbing, make sure the inlet water is
connected to the inlet of the filter. Arrows on the valve body indicate direction of flow. Make sure the
bypass valves are in the correct position See Figure 3. An internal check valve is supplied with the sys-
tem and has already been installed in the inlet of the control valve to ensure that the air charge in the
top of the tank does not escape backwards out the inlet.
Note: All plumbing should be done in accordance with local plumbing codes.
Warning: The control valve, fittings and/or bypass are designed to accommodate minor plumbing mis-aligments
6

Installation Guide

to disassemble it. Call us first 877-414-PURE
but are not designed to support the weight of a system or the plumbing.
UNITED WATER INC.
A
AtAIOIF-S
quAtek
u
G
erIeS
Ser
uIde