電源 Alpha ESS Backup Box V02のPDF クイック・インストール・マニュアルをオンラインで閲覧またはダウンロードできます。Alpha ESS Backup Box V02 2 ページ。
SUMMARY
Fault
Backup
Grid
Communication Port RJ45
RJ45
Backup Box COM
1
NC
2
NC
3
RS485-A (Backup for Storion-T5)
4
RS485-A (Meter)
5
RS485-B (Meter)
6
RS485-B (Backup for Storion-T5)
7
NC
8
NC
Communication Cable Specification
Meter Patch Cable for Backup Box
RJ45 Connector
RJ45 Connector
Or/W
Or/W
1
1
Or
Or
2
2
G/W
BI
3
3
BI
G/W
4
4
BI/W
G
5
5
G
BI/W
6
6
Br/W
Br/W
7
7
Br
Br
8
8
Note: Meter patch cable for backup box is different from backup patch cable for
backup box. Meter patch cable for backup box must be connected in the right place
as the diagram shows.
Mode
Mode
System
Single Phase
SMILE5/SMILE-B3
Three Phase
SMILE-T10
Power Resumption
SMILE5/SMILE-B3/SMILE-T10
Latency Time 310s
Normal Power
SMILE5/SMILE-B3/SMILE-T10
Resumption
INSTALLATION
02
INSTALLATION
SMILE-T10 Connection
②
Meter Port
ś
Storion-
PV
LOAD3
SMILET10
BACKUP
AC
①
Ś
PV
PV-INV
meter
Note: 1. Hybrid coupled with ① and ②. DC coupled with ②. AC coupled with ①
2. The load power of each phase must be within 5kW.
SMILE5/SMILE-B3 Connection (single phase grid in house)
Patch Cable recommend CAT5
②
Meter Port
ś
PV
SMILE-B3
LOAD3
SMILE5
BACKUP
AC
①
Ś
PV-INV
PV
meter
DSP_BackupBox
Communication Lost/Relay
Backup Normal
Grid Normal
Inverter/EMS Meter Port
NC
NC
RS485-A
—
—
RS485-B
NC
NC
CAT5 Recommended as Patch Cable
RJ45 Connector
RJ45 Connector
Or/W
Or/W
1
Or
Or
2
G/W
G/W
3
BI
BI
4
BI/W
BI/W
5
G
G
6
Br/W
Br/W
7
Br
Br
8
DIP Switch
Description
Turn on DIP switch 1.
1
Turn off DIP switch 1.
1
Turn on DIP switch 4
4
Turn off DIP switch 4.
4
Patch Cable recommend CAT5
LOAD2
LOAD1
meter patch cable
for backup box
L1
L2
L3
GRID
N
PE
DSP_BackupBox
LOAD2
LOAD1
meter patch cable
for backup box
L
N
GRID
PE
03
04
Dimension
Dimension
Note: Operated by qualified electrician only.
1.4 Installation of Fuse Holder
1
2
3
4
5
6
7
GRID
8
Connect the power cables from BackupBox Load – L1, L2, L3 to the top of the fuse holder, and then
connect cables from the bottom to the load.
Note: The position where the fuse holder is installed in the distribution box is not
specified. The installer can adjust the installation position of the fuse holder
according to the actual installation scenario. The length of the related wire harness
on the fuse holder can be adjusted according to the actual needs. The terminals will
be in the parts list.
05
06
SMILE5/SMILE-B3 Connection (three phase grid in house)
Note: Hybrid coupled with ① and ②. DC coupled with ②. AC coupled with ①.
It is not allowed to connect the cable as the following :
Storion-
SMILET10
BACKUP
①
Ś
PV
208
ON
COM
OFF
ON
COM
OFF
AC
BAK LOAD AC
BAK LOAD AC
BAK LOAD AC
BAK LOAD
N
L3
L2
L1
ON-GRID INV
PE
N
L3
L2
L1
Patch Cable recommend CAT5
Meter Port
②
ś
PV
SMILE-B3
LOAD3
LOAD2
LOAD1
SMILE5
BACKUP
AC
①
Ś
PV
PV-INV
meter
DSP_BackupBox
patch cable
Meter Port
②
ś
PV
LOAD3
LOAD2
LOAD1
AC
PV-INV
meter
DSP_BackupBox
INSTALLATION
46
67
INSTALLATION
meter patch cable
for backup box
L1
L2
L3
GRID
N
PE
meter patch cable
for backup box
L1
L2
L3
GRID
RCD
N
PE